Progress Report Two

We’re getting close! We don’t have an official date of opening the doors quite yet, but it’s coming.

Since the last pictures, these ones below show the addition of the front door, the repairs and updates to the lower section of the building and then a nice fresh coat of paint. Our sign is in progress and will be added above the door soon.

Out of Bounds Building Front

 

Next we have some images if the interior. We are currently working on the walls and getting those finished up. The walls are particle board which will have a nice, natural tone stain on them when complete. Then we have tin wrapping the bottom portions of the walls and trimmed out in cedar.

Out of Bounds Building Interior

 

The last item in this progress report is the back of the building. This wall was completely remodeled from a large set of barn styled doors, to the two windows and door shown here. These windows look out at where the driving range will be. We will also be adding a covered patio over this area with some tables for hanging out during events, watching people throw discs on the range, or just taking a break between your throws.

 

We are working fast to at least get the doors open on the shop in the next few weeks. Stay tuned for the next progress report and launch date.

GET 10% OFF DISCS!

When you opt in to hear about new products and store news.

Don’t worry, we don’t send news every day and we never share your info.

FIRST CODE WILL POP UP IN THIS BOX. 

FLAT RATE SHIP $4.99!! -- All Discs 15% OFF Black Friday -- Next Ship Date Tue Dec 3rd.
This is default text for notification bar